Wrong delivery date in PR generated through MRP

$
0
0

Hi,

 

I have maintained Planned delivery time in info record only not in material master. When we run the MRP day today system is showing planned date, delivery date & release date same as MRP run date.

 

In T code OMDT we have also  tick the he check box " Scheduling: Info Rec / Agreement" and also maintained the planned delivery time in the contract.

 

Then why the system is picking planning run date and delivery date same?

Any point I am missing which is to be considered.

 

For cross check when I enter the planned delivery time in material master than system is giving delivery date ok.

But when it is maintained only in info record then the system is picking delivery date same as planning run date.

 

 

 

 

Regards

Aman