Dear Gurus,
i'm trying to release an invoice through MIRO.
The posting date is 31.12.2015, when i save the system says that last document posted has date 10.01.2016.
Since this validation exit shouldn't run, i activated the trace of validation, and i noticed that when i run MIRO there is a double run of validations, one with BUDAT 31.12.2015, and after this another with budat 01.01.2016.
It's like the MIRO is generating 2 invoices!
I noticed that i'm experiencing this problem when there are Material account position (i saw it by simulating).
Is there a note or something else that can solve this double invoice problem?
thanks
Gianni